Pages

Tuesday, October 23, 2012

Renovation Update!

OK so it has been a while since I have updated here. I think this is because now that the main things have been done like the kitchen and the bathroom, it is the annoying and time consuming things that are left! There are plenty of those.

So, in the past few weeks I have started painting a lot of the woodwork. That is going to take a bit of time as a lot of it needs to be stripped back first before it can be painted. I have done probably about half that is needed on the doors and some of the door frames.

Bedroom 2 - Nothing exciting but at least it is finished!
Also, as of last week the second bedroom is complete. I got a carpet fitted (neutral tones of course) and have now set it up as my office. With this done I moved a lot of the stuff that was in the bedroom, into the lean to, so it is now all clean and tidy. the lean to is also more organised with decorating materials and tools on a big shelving unit.

The main lean to off the kitchen is currently being used as an art studio and eventually this will have to be shifted out when that gets a make over, but for now it does me quite well as it does not matter if I mess it up!

I have also been working on plastering the fireplace in the living room and will hopefully be in a position to put wallpaper on the chimney breast in a few days time. Then I can get the living room carpeted (with some help from friends to move out all the furniture hopefully!).

There is still a lot of work to do in the garden. Like all gardens it doesn't matter how much you weed, they still come back! I need to continue cleaning the paving slabs as well but I feel that winter may now get in the way of some of the outdoor plans.

Thursday, October 4, 2012

Kitchen Painted & Central Heating Connected

So this last week I have painted the kitchen and some internal doors (looks like those are going to need 3 coats each). I chose a light olive green colour for the kitchen and I really like the way it has come out.  Now I just need to get the floor down and that should happen in the next couple of weeks, then the kitchen will be finished.

Also this week all of the work on the central heating was finished and the pipework connected to the boiler. All I need now on that front is for the gas supply to get connected which will happen tomorrow morning. National Grid put in the pipe and the meter box last Friday and Eon will be putting in the meter tomorrow.

Once the central heating is up and running and I have hot water at last I will carpet up the 2nd bedroom. That is all decorated (although might need a touch up now that the builders have finished) and then I can make that into a proper study. It will be nice to have that room finished, which will add to the bathroom which is pretty much done except for painting the door.

So, there is still plenty of work to do and sometimes it seems never ending but at least I can see progress happening. I am going slightly over budget as the kitchen cost a bit more than planned so that is a worry but I'll just have to find the cash, get it finished and get it back on the market.

There was a bungalow up for sale down the road for £139,995 and that now appears to be sold but it does have a conservatory and a garage so maybe I am looking at £130-135k as a potential sale price.

Friday, September 28, 2012

New Gas Supply

So today I got the new gas supply. This has been ongoing for a while and I believe that National Grid put my application on hold by mistake at one point leading it to take 3 months to get the work done rather than the 3-4 weeks I was promised initially. The guys came and dug up the road and the garden and put the connection through to the outside wall where they installed a white meter box.

The only problem was that I had not thought about the fact that I would have to request a meter (and gas connection) from a supplier. I phoned e.on yesterday and unfortunately there is a 6 working day wait for this (at least it is not weeks or months!) so the gas won't get connected until next Friday, and hence no hot water or heating for another week. I have an electric fire in the living room and a fan heater in the bedroom so that is OK but will have to keep boiling the kettle numerous times to get a bath! Either that or go swimming a bit more often!

Having gas central heating and a new boiler will I think make the house more saleable in future as well as bringing it into the 21st century!

Tuesday, September 25, 2012

Kitchen and Bathroom Finished!

OK so the kitchen and bathroom fitters worked pretty damn hard to get both rooms as finished as possible at the end of last week as I was having people round for a barbeque on Saturday. They then came back yesterday to do the final touches and to put in more pipes for the central heating.

The bathroom is finished and just needs me to paint the woodwork around the door and the door itself. Here are the before and after pictures of the bathroom:


The kitchen now just needs the walls painting and some flooring added, which will be done after the rest of the heating pipes have gone in under the floor. It looks like I didn't take great 'before' pictures of the sink area but you can see the remains of the larder cupboard that was taken out together with all of the pipes to the tank in the loft (which was taken out). Also there was a false wall at the other end that needed removing and every wall needed replastering.




Monday, September 17, 2012

Dust, dust and more dust!

So today work started on the kitchen (at the same time as the bathroom!). ALl of the units have come out apart from the sink and the channeling has been done for the electrics. Unfortunately this has created a ton of dust which i only realised after getting in after being out for a few hours. So, nothing much was covered and the whole of the lounge is covered in a massive layer of dust :-( So, dust sheets now on for the rest of the mess and I'll just have to wait until it is done before I can clean it all up.

So the kitchen is stripped and looking like this:

Thursday, September 13, 2012

The Bath is In

OK so a bit more progress on the bathroom, the bath is in along with most of the pipework so it is mostly a case of getting the basin in and changing over the toilet to the new one then tiling the whole room.


Monday, September 10, 2012

Work Started on the Bathroom

So the bathroom fitter started work today and started knocking off all the old tiles, removing the sink and redoing a lot of the pipework. He had to hold off on changing the toilet or else I would have been a bit stuck but tomorrow the bath should get in with a temporary shower as the boiler is not getting connected until the gas comes on 28th September.