So today I got the new gas supply. This has been ongoing for a while and I believe that National Grid put my application on hold by mistake at one point leading it to take 3 months to get the work done rather than the 3-4 weeks I was promised initially. The guys came and dug up the road and the garden and put the connection through to the outside wall where they installed a white meter box.
The only problem was that I had not thought about the fact that I would have to request a meter (and gas connection) from a supplier. I phoned e.on yesterday and unfortunately there is a 6 working day wait for this (at least it is not weeks or months!) so the gas won't get connected until next Friday, and hence no hot water or heating for another week. I have an electric fire in the living room and a fan heater in the bedroom so that is OK but will have to keep boiling the kettle numerous times to get a bath! Either that or go swimming a bit more often!
Having gas central heating and a new boiler will I think make the house more saleable in future as well as bringing it into the 21st century!
The only problem was that I had not thought about the fact that I would have to request a meter (and gas connection) from a supplier. I phoned e.on yesterday and unfortunately there is a 6 working day wait for this (at least it is not weeks or months!) so the gas won't get connected until next Friday, and hence no hot water or heating for another week. I have an electric fire in the living room and a fan heater in the bedroom so that is OK but will have to keep boiling the kettle numerous times to get a bath! Either that or go swimming a bit more often!
Having gas central heating and a new boiler will I think make the house more saleable in future as well as bringing it into the 21st century!