OK so the kitchen and bathroom fitters worked pretty damn hard to get both rooms as finished as possible at the end of last week as I was having people round for a barbeque on Saturday. They then came back yesterday to do the final touches and to put in more pipes for the central heating.
The bathroom is finished and just needs me to paint the woodwork around the door and the door itself. Here are the before and after pictures of the bathroom:
The kitchen now just needs the walls painting and some flooring added, which will be done after the rest of the heating pipes have gone in under the floor. It looks like I didn't take great 'before' pictures of the sink area but you can see the remains of the larder cupboard that was taken out together with all of the pipes to the tank in the loft (which was taken out). Also there was a false wall at the other end that needed removing and every wall needed replastering.
The bathroom is finished and just needs me to paint the woodwork around the door and the door itself. Here are the before and after pictures of the bathroom:
The kitchen now just needs the walls painting and some flooring added, which will be done after the rest of the heating pipes have gone in under the floor. It looks like I didn't take great 'before' pictures of the sink area but you can see the remains of the larder cupboard that was taken out together with all of the pipes to the tank in the loft (which was taken out). Also there was a false wall at the other end that needed removing and every wall needed replastering.